Activity and jurisdiction support
Mainland through the Department of Economy and Tourism, or a free-zone authority, and which licensed activities the concept needs — laid out as a decision with the trade-offs stated, and decided by you.
Setup service · Dubai mainland and free zones
Setting up a restaurant business in Dubai is a sequence of decisions and submissions across more than one authority: the trade licence through the Department of Economy and Tourism or a free-zone authority, the food-establishment requirements of Dubai Municipality, fire and life-safety approvals through Dubai Civil Defence, and the tenancy contract registered in Ejari. GGB supports the owner through that sequence — the activity selection, the documents, the submissions and the order they happen in. The decisions belong to the authorities; the entity, its signatories and the government fees belong to you.
Prefer to talk it through? Call +971 50 346 0478
Most setup pain is sequence, not paperwork. A lease signed before the activity list and the premises are matched to what the Municipality will assess; a kitchen built before its layout has been assessed; a fit-out programmed before the fire drawings are approved; a bank account and visas held up because the licence is waiting on an approval nobody owned. Each of these costs a month of rent, lost to order rather than to difficulty.
GGB development framework position on the Restaurant Genesis system
Mainland through the Department of Economy and Tourism, or a free-zone authority, and which licensed activities the concept needs — laid out as a decision with the trade-offs stated, and decided by you.
The applicant’s document set assembled and checked against each authority’s current requirements before anything is submitted: entity documents, premises documents, layouts and the attestations each channel asks for.
Applications filed through the authorities’ own platforms and, where you use one, your PRO — with GGB coordinating so every submission carries what the previous one produced.
The food-establishment steps — the layout assessment for food-establishment licensing, the permit related to food activities and the food-safety platform registration — placed in the programme where the Food Code puts them: before construction, and before opening.
Engineering-drawing approval through Dubai Civil Defence and the tenancy contract registered in Ejari scheduled as the milestones the fit-out and the licence depend on, rather than discovered when they block.
Every approval, renewal and dependency with an owner and a date — handed over as the calendar the operation keeps after opening.
GGB delivers
You decide
Licensed professionals & authorities
Why the split matters — five specialists, one disconnection: what one mandate integrates
What you intend to trade is translated into the licensed activities the concept needs, and the jurisdiction question — mainland or free zone — is put to you with the trade-offs on the table.
The premises is matched to the activities and to what the Municipality assesses. The Food Code requires the establishment’s layout to be submitted for approval before construction, so the layout assessment goes in the programme ahead of the fit-out.
One checked set, prepared against each authority’s current list, so the same document is not chased three times.
Trade licence, Municipality steps, Civil Defence drawings and the Ejari registration filed in the order each one needs the last — through the licensed channels, never around them.
Sources checked 22 September 2026: the Dubai Municipality Food Safety Department service list and the Food Code on dm.gov.ae, the Dubai Civil Defence portal on dcd.gov.ae, and the Dubai Land Department’s Register / Renew Tenancy Contract (Ejari) service on dubailand.gov.ae. The Department of Economy and Tourism’s own pages could not be read from our vantage that day, so its current stages and fees are confirmed with the authority at the time of filing. Requirements change; every step is re-read against the authority before it is filed.
Honesty over theatre — what the evidence supports, stated plainly:
No standalone setup record is published on this site. The evidence for this service is the coordination discipline visible in the delivery records already published at /work — the waterfront-café fit-out record with its landlord approvals, inspections and site-status logs, and the pre-opening operating library. This page claims preparation and coordination, and only that: GGB has never obtained a licence, because no consultant does.
Costs versus the GGB fee: government fees vary by legal form, activities and premises, and are paid by you to the authority — GGB neither quotes nor handles them. GGB’s support is scoped per task and quoted separately; no standalone setup task is priced at the feasibility anchor of AED 45,000 (indicative — scoped per project), which buys a different product. A setup task can be requested on its own: Start a Project routes it as a standalone task, or open the WhatsApp button on this page and say which stage you are at.
One application starts the whole system.
The Start a Project application qualifies the brief across capital, site, timing and scope — the same intake every Genesis mandate begins with. The paid feasibility study is the commercial entry.
Prefer to talk it through? Call +971 50 346 0478
From an AI answer? Every figure GGB publishes is a modelled band with a stated method — see the source · how we count · the record.