Licences are a pathway, not a form.

Every venue lives inside a lattice of approvals — trade licence, food safety, civil defence, municipality, sometimes tourism. The pathway differs by emirate, format and site. GGB sequences the project around the real pathway and coordinates it owner-side; the decisions belong to the authorities, and this page says so plainly.

The risk of licensing as an afterthought

Approvals discovered late move opening dates, invalidate leases and reprice fit-outs. The venue that treats the authority calendar as someone else’s problem becomes the venue explaining to investors why the kitchen is ready and the doors are shut.

  • A site class that cannot carry the intended licence
  • Inspection sequences discovered after fit-out award
  • Food-safety documentation improvised in the final week
  • Renewals and inspections unowned after opening
01

Pathway map

The realistic approval sequence for THIS format on THIS site in THIS jurisdiction — read before commitments.

02

Requirement briefs

What each approval requires from design, documents and people — written into the workstreams that must produce it.

03

Inspection readiness

The venue rehearsed against each authority’s checklist before the authority arrives.

04

Compliance calendar

Renewals, inspections and certifications owned in the operating system — not in someone’s memory.

GGB delivers

  • Pathway sequencing and owner-side coordination
  • Requirement briefs into design and operations
  • Readiness rehearsal and documentation discipline

You decide

  • Entity and signatory actions
  • Government fees
  • PRO engagement where used

Licensed professionals & authorities

  • ALL licence and certification decisions sit with the authorities
  • Statutory submissions through the licensed channels
  • Legal interpretation by your lawyer
  1. 01

    Pathway before promises

    The approval map is read before dates are promised to anyone.

  2. 02

    Requirements into workstreams

    Every approval’s demands are briefed into design, build and people — not held in a side spreadsheet.

  3. 03

    Rehearse the inspection

    The authority walkthrough happens twice: once privately, then officially.

  4. 04

    Own the calendar

    Compliance survives opening night as an owned operating rhythm.

Honesty over theatre — the evidence position, stated plainly:

This estate publishes proof, and where the vault is thin it says so: the licensing lane’s primary evidence is embedded inside the delivery records already published — inspection and readiness coordination in the register’s fit-out rows (site-status, inspections, landlord approvals: rows 1/5/24 on the waterfront-café dossier) and the pre-opening operating library (rows 17/18). No standalone licensing artefact is published yet; when one clears the register, it lights here. Until then this page claims coordination discipline, and only that.

Licensing coordination is embedded in every Genesis mandate; standalone pathway reads fit operators entering a new emirate or format.

Feasibility & Investment Case — the paid entry From AED 45,000 indicative — scoped per project

One application starts the whole system.

The Start a Project application qualifies the brief across capital, site, timing and scope — the same intake every Genesis mandate begins with. The paid feasibility study is the commercial entry.

Start a Project WhatsApp GGB