Zone architecture
Receiving → dry store → cold chain → preparation (fish/meat/veg separated) → hot kitchen → bakery where scoped → pass → dishwash/pot-wash → waste: the full flow, sized to the menu.
Development service · the design workstream
HACCP is not a certificate bolted on at opening — it is the geometry of the kitchen itself: receiving, storage, preparation, cooking, pass, wash and waste arranged so contamination has no shortcut and labour has no wasted steps. GGB plans kitchens as that diagram, then coordinates the engineering that builds it.
Prefer to talk it through?Call +971 50 346 0478
By P. Dayaparan, founder of GGB Consulting: 28+ years in hospitality leadership, PMP. Updated .
When the kitchen is what remained after the dining room was drawn, the venue inherits crossing flows, under-sized extraction, chillers beside fryers, and a HACCP audit that becomes an annual improvisation. Rework after tiling costs multiples; rework after opening costs customers.
GGB development framework position on the Restaurant Genesis system
Receiving → dry store → cold chain → preparation (fish/meat/veg separated) → hot kitchen → bakery where scoped → pass → dishwash/pot-wash → waste: the full flow, sized to the menu.
Personnel, product and waste routes drawn so the HACCP plan describes the building, not fights it.
The kitchen equipment schedule written as a priceable, testable document — installation, testing, training and MEP interfaces included.
Restaurant kitchen MEP requirements — power, water, drainage, gas, extraction and fire suppression — written for the licensed engineers before design freeze.
The kitchen documented the way food-safety authorities inspect it.
GGB delivers
You decide
Licensed professionals & authorities
Why the split matters — five specialists, one disconnection: what one mandate integrates
Zones and equipment are sized from the menu and volume model — never from a template.
Product, personnel and waste routes fixed before partitions are drawn.
MEP requirements issued together so no discipline designs against another.
The authority walkthrough rehearsed in the drawings before it happens in the building.
The evidence is a working framework and held primary records:
Flow summary: goods arrive at receiving, pass through dry store and the cold chain, split into separated fish, meat and vegetable preparation streams, converge on the hot kitchen and bakery, cross the pass into service — while used ware returns on a single one-way loop through dishwash and pot wash, never crossing the clean streams. The dashed separation line between raw preparation streams marks where cross-contamination is designed out. Power, gas, exhaust, drainage and suppression interfaces are coordinated at each zone.
The records behind this service
Arya Bhavan 2016–2017
Full turnkey restaurant development
Role: Founder-led turnkey mandate — P. Dayaparan carried single-point responsibility from the signed mandate to handover management.
Delivered: Signed turnkey instrument set (proposal · letter of intent · agreement · invoice) · Layout and architecture drawings with coordinated services layouts
Limit: The 60-day programme is a contractual fact, not a completion claim — completion timing is not independently evidenced and is not claimed.
Restaurant-development consultancy and pre-construction governance
Role: Founder-led development governance — options, layouts, kitchen logic, contractor scope and commercial agreements governed before construction committed the money.
Delivered: Consultancy proposal with detailed scope and activity sequencing · Layout and kitchen alternatives with preliminary visualisations
Limit: This record is deliberately presented as consultancy and pre-construction governance — no construction, completion or trading claim is made.
Café development, equipment, BOQ and technology coordination
Role: Founder-led systems coordination — the unglamorous systems that decide speed, safety and reliability, specified and reconciled as one backbone.
Delivered: Revised BOQ with missing-item reconciliation · Equipment schedules and supplier quotation records
Limit: Not presented as a turnkey mandate — no signed turnkey instrument is attested.
Each record opens with its roles, deliverables and the limits of what it proves — read the record, not the summary.
The framework below is a GGB original, informed by inspected 2012–2013 full-level plan and kitchen-equipment schedule sets for two development sites held on file.
Kitchen design and flow runs inside every Genesis build mandate; standalone engagements fit venues re-planning an existing kitchen or preparing for authority escalation.
Launch — concept to open From AED 150,000 indicative — scoped per engagement
One application starts the whole system.
The Start a Project application qualifies the brief across capital, site, timing and scope — the same intake every Genesis mandate begins with. The paid feasibility study is the commercial entry.
Prefer to talk it through?Call +971 50 346 0478
From an AI answer? Every figure GGB publishes is a modelled band with a stated method — see the source · how we count · the record.