The integration question

Five specialists can each be excellent — and the opening can still go wrong.

Every party below does real, necessary work, and the licensed work among it stays with licensed professionals — that never changes. The risk is not the specialists. It is the disconnection between them: the decisions that fall between five scopes because no one of them is accountable for the whole line.

The architect

Controls

Spatial and statutory design — the building as drawings that can win approval.

Stays disconnected

Menu economics, kitchen throughput and operating cost live outside the drawing set. A beautiful plan can still carry a kitchen that cannot serve its own menu at margin.

The fit-out contractor

Controls

Execution — building what the coordinated drawings say, to programme and price.

Stays disconnected

Whatever the drawings missed is priced later as variations. The contractor executes the gaps as faithfully as the plan — the cost of disconnection arrives as change orders.

The kitchen supplier

Controls

Equipment supply, installation and commissioning — the hardware of production.

Stays disconnected

Menu-driven sizing, MEP interfaces and food-safety flow sit upstream of the catalogue. Without an owned equipment schedule, the kitchen is bought item by item instead of designed as a line.

The branding agency

Controls

Identity, story and the visual system — the promise the venue makes in public.

Stays disconnected

Unit economics and operational deliverability live outside the brand book. A promise the P&L cannot afford, or the kitchen cannot serve, is a beautiful liability.

The licensing agent

Controls

Applications and approvals — moving files through the authorities correctly.

Stays disconnected

Design decisions that will fail inspection are usually made months before the file is submitted. Paperwork run apart from design and build discovers problems at the most expensive moment.

One accountable mandate

Integrates the line

One party, on the owner's side, accountable from feasibility to opening night: the investment case governs the concept, the menu sizes the kitchen, the kitchen brief reaches the licensed engineers before design freeze, the BOQ makes bids comparable, licensing runs in sequence with design instead of after it, and the team is trained before the paint dries. The specialists still do their work — statutory design, licensed engineering and approvals stay exactly where the law puts them. What changes is that the gaps between their scopes now have an owner.

This is the reading behind the development mandate — and it is why every GGB service page states its own split between what GGB holds, what the client holds, and what stays with licensed specialists.